Villa exterior wall insulation talks about the construction technology of exterior wall hanging panels?
Release time:
2024-04-18
Steel nails for exterior wall hanging boards should be driven into the center of the nail holes. Nailing on boards without nail holes is not allowed to prevent the boards from protruding and deforming due to expansion and contraction space. There should be 1mm left between the nail head and the hanging board. The left and right gaps should not be nailed too tightly.
Exterior wall hanging board is a kind of construction building material, which is mainly used in exterior wall construction. Its main function is to insulate the exterior wall and prevent the exterior wall from being damaged. So, what should we do when we are doing construction ourselves? Let’s follow the villa exterior wall insulation editor to take a brief look at it!
1. First measure the verticality of the outer corners of different floors and the horizontality of the initial level of horizontal development. If the error is too large, remedial measures should be negotiated with Party A. The construction can only be carried out after Party A approves.
2. Suspension installation procedures, mounting accessories, exterior corner posts, corner posts, starting strips, J SLUG installation wall panels, should allow a smaller 6mm expansion space between the panel and the hanging angle of the product.
3. Since the wall has an insulation layer, plastic expansion bolts and screws are used to fix the hanging board. The total length of the expansion bolt is: insulation layer thickness mm + cement mortar thickness + 35mm. The depth of the wall should not be less than 30mm. The diameter of the steel screw is 4mm. The head diameter is not less than 8mm. Fix an expansion bolt every 60-1750px and a steel screw every 30-1000px.
4. The steel nails of the exterior wall hanging board should be nailed in the center of the nail hole. Nailing on the board without nail holes is not allowed to prevent the board from protruding and deforming due to the expansion space. There should be a gap between the nail head and the hanging board. Leave a gap of about 1mm and do not nail it too tightly.
5. When two hanging boards are butt installed, the overlap amount is 25-50mm. The flange of one hanging board should be cut off to make the overlap smoother.
Latest News
Ancient wall gray six bricks pattern 16mm thickness PU metal siding board for external wall decoration
2025-10-09
Angle white six bricks pattern 16mm thickness PU sandwich wall panel for external wall decoration
Angle white six bricks pattern 16mm thickness PU sandwich wall panel for external wall decoration
2025-10-08
Angle white wood grain inclined groove pattern 16mm thickness PU metal siding panel for external wall decoration
2025-10-07
Seven container export to Thailand with light steel frame structure and calcium silicate board
Seven container export to Thailand with light steel frame structure and calcium silicate board
2025-10-03
Sixth container export to Thailand with light steel frame structure and metal siding panel and calcium silicate board
2025-09-30
Fifth container export to Thailand with external wall decoration panel and asphalt shingle and rock wool
2025-09-29